Supplying power to 3 new prefabricated buildings which will be the new Australian High Commission complex in Funafuti. Includes a solar, battery and generator system for the site to be fully self powered.
Electrical and mechanical design and construction of a number of new buildings at the Kiribati Institute of Technology and Youth Learning Centre in Betio. Includes a diesel backup generator inter-connected with the local mains power supply. Lighting and power, air conditioning, communications and security.
A new humanitarian warehouse in Kiribati. Power supply to site (including both solar with backup batteries and utility connections), lighting, power and communications.
Connection to the local utility power and a 48-panel solar system to power an undersea communications cable landing station.
A 20-panel solar system to power an undersea communications cable landing station.
New LAO for the Samoan Parliament in Apia, with extensive power and fibre underground and surface cable trays reticulation. Switchboards, power factor correction, UPS, lightning protection, general power, lighting & controls and communications outlets.
Two new temples for the Church of Jesus Christ of Latter-day Saints in Tarawa, involving HV transformers, mains & distribution switchboards, generators, power supplies and area lighting. Air conditioning, exhaust fans, louvres and ducts. Communications, security and audio-visual.